Fly ash sampler sampling

time:2023-11-25 22:42:41Views:

1. Determination of Sampling


The sampling of fly ash sampler is selected on the flue between the outlet of the air preheater and the inlet of the dust collector. The specific installation location should generally meet the following conditions:


The flue gas temperature is less than 370 ℃;


At the straight pipe outer wall of the horizontal flue, and at a height of 1/3 of the flue from the bottom of the flue; Or at the straight pipe side wall of the vertical flue, and at a distance of 1/3 of the flue thickness from the rear wall of the flue;


There are no obstacles in the flue that affect positive sampling;


The representative parts of smoke flow velocity and dust particles;


There is a space outside the flue for the installation of measuring devices and normal operation.


2. Opening of sampling holes


According to the determined sampling location, remove the insulation layer of the flue after shutdown, and cut a 142mm (width) X232mm (height) rectangular hole on the flue wall for welding the rectangular flange.


3. Welding of canopies, flanges, and brackets


Remove the insulation layer of the flue between the canopy and the installation bracket of the measurement unit according to Figure 5, and then weld the canopy, rectangular flange, measurement unit installation bracket, extended angle iron, support angle iron, and pressure regulating valve installation plate separately (the welding position of the extended angle iron and pressure regulating valve installation plate depends on the on-site situation). When welding, it is necessary to ensure that the distance from the bottom edge of the rain shelter to the rectangular flange is 130mm; 2. The installation surface of the rectangular flange is perpendicular to the ground; 3. The distance from the installation surface of the rectangular flange to the flue wall is 350mm; The distance between the installation bracket of the measuring unit and the rectangular flange is ensured by the welding auxiliary connecting plate.


 

手機導入圖片 1202.jpg

手機導入圖片 1205.jpg

手機導入圖片 1204.jpg

If the sampling unit is not installed temporarily, the square holes on the rectangular flange should be covered with the flange cover provided by the manufacturer and tightened with screws to ensure the sealing of the flue during boiler operation.


4. Welding of on-site control cabinet installation bracket


The installation bracket of the control unit can be welded between two measuring units or on a steel column near a certain measuring unit according to the on-site conditions. During welding, the height from the edge of the installation bracket to the on-site walkway or platform surface should be about 1.8 meters.


5. Installation of sampling unit


6. Adjust the sampling tube


According to the different positions of the flue installed in the sampling unit, it is necessary to adjust the sampling tube to ensure that the direction of the intake nozzle of the sampling tube is aligned with the direction of the flue gas flow. Adjustment method: 1. Loosen the nut (1), 2. Loosen the long nut, 3. Pull out the sampling tube in an upward direction until the cylindrical pin on the circular flange of the sampling tube is detached from the installation plate. 4. Rotate the sampling tube according to the flow direction of the throat at the installation position, so that the intake nozzle of the sampling tube is facing the direction of the smoke flow. Then insert the cylindrical pin on the circular flange of the sampling tube into the corresponding positioning space on the installation plate. 5. Tighten the long nut, 6. Finally, tighten the nut (1).


7. Installation of measurement units


Installation method: 1. Place the measuring unit on the installation rack and place a spirit level (provided with the equipment) on the measuring unit section; 2. By adjusting the lifting of the four bolts and rods at the bottom of the measuring unit, combined with the stable horizontal movement of the measuring unit, the ash inlet of the measuring unit is concentric with the lower ash outlet of the sampling unit cyclone dust collector. At the same time, the transition pipe component can precisely connect the lower ash outlet of the sampling unit cyclone dust collector and the ash inlet of the measuring unit; 3. Fine tune the 4 rod bolts at the bottom of the measuring unit, while observing the level of the measuring unit, so that the surface of the measuring unit is in a horizontal state; 4. Tighten the nut of the transition pipe component between the measuring unit and the sampling unit cyclone dust collector; 5. Tighten the four parallel nuts of the rod bolts at the bottom of the measuring unit; 6. Tighten the four tie rod bolts at both ends of the bottom of the measuring unit and tighten the nuts; 7. After the installation of the measurement unit is completed, restore the insulation layer and protective iron sheet on the flue wall.


zanpc zanpchover
wechat 分享到微信
wechat 分享到微信
weibo 分享到微博

產(chǎn)品動態(tài)

打賞
手機看全文
手機掃碼看全文
分享
微信好友
復制鏈接
掃碼分享至微信

微信掃碼支付

支付寶掃碼支付

Fly ash sampler sampling廠家Copyright ? 2012-2023 Lianyungang Lingdong Electromechanical Equipment Co., Ltd all rights reserved

Tel

0518-85370171

日韩欧美一区二区不卡视频| 亚洲天堂精品1024| 亚洲精品成人综合色在线| 91福利免费一区二区三区| 亚洲第一视频少妇人妻系列| 日本东京热加勒比一区二区| 亚洲综合伊人五月天中文| 91国自产精品中文字幕亚洲| 精品一区二区三区三级视频| 91免费一区二区三区| 国产成人av在线免播放观看av| 99福利一区二区视频| 亚洲黄香蕉视频免费看| 日本人妻精品中文字幕不卡乱码| 91精品视频全国免费| 日本不卡视频在线观看| 91欧美亚洲视频在线| 欧美精品一区二区水蜜桃| 99热九九在线中文字幕| 国产精品午夜福利在线观看| 色婷婷亚洲精品综合网| 91福利视频日本免费看看| 视频一区中文字幕日韩| 国产伦精品一一区二区三区高清版 | 欧美激情床戏一区二区三| 国产一区二区三区四区免费| 精品国产亚洲一区二区三区| 午夜精品国产一区在线观看| 丁香七月啪啪激情综合| 久久精品中文扫妇内射| 国产麻豆成人精品区在线观看| 亚洲人妻av中文字幕| 日木乱偷人妻中文字幕在线| 97人摸人人澡人人人超碰| 国产传媒高清视频在线| 在线精品首页中文字幕亚洲| 黄色片一区二区三区高清| 国产精品午夜一区二区三区 | 欧美午夜一级艳片免费看| 亚洲精品成人午夜久久| 亚洲精品中文字幕在线视频|